News/Project delivered/May 2022

Walker Modular bathroom pods at Willen House, 8 Bath Street, Islington

Walker Modular supplied bathroom pods for Willen House at 8 Bath Street, Islington — a residential development in central London delivered on a tightly constrained inner-city site.

Willen House at 8 Bath Street, Islington, shown at dusk with its curved white banded façade and lit windows

Location

Bath Street, Islington, London

System

Steel framed

Sector

Residential

Location

Islington, London

The story

Walker Modular's role on Walker Modular bathroom pods at Willen House, 8 Bath Street, Islington.

Willen House at 8 Bath Street sits in Islington, on a tight inner-London site bounded by existing buildings and busy streets.

Walker Modular supplied factory-manufactured bathroom pods for the development. Waterproofing, services, tiling and sanitaryware were completed under factory conditions and each pod was inspected before dispatch.

Central London sites offer very little space for storage, deliveries or extended wet trade sequences. Delivering finished bathrooms directly into position reduced both the number of trades working on site and the volume of material and waste that had to be handled there.

Pods were delivered to a programmed sequence by Walker Modular's own fleet and drivers, who work regularly into restricted central London locations.

Each pod carried an individual digital quality record, providing full traceability from manufacture through to installation.

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.