Case studies

Delivered at scale,
across every sector.

Selected Walker Modular projects across hotels, student accommodation, BTR, PRS, residential and healthcare — from boutique schemes to towers.

20+ years manufacturing200,000+ pods delivered
Castle Leazes, Newcastle
PBSA2,000 podsGRP

Castle Leazes, Newcastle

2,000 bespoke seamless bathroom pods for the £250 million Castle Leazes student village redevelopment in Newcastle.

30 Marsh Wall, Canary Wharf
PBSAc. 1,000 podsGRP

30 Marsh Wall, Canary Wharf

Approximately 1,000 bespoke bathroom pods for Vita Group's 1,068-bed, 48-storey PBSA development at Canary Wharf.

Loft Lines, Titanic Quarter
Build to Rent742 podsSteel framed

Loft Lines, Titanic Quarter

742 steel framed bathroom pods delivered for a major 778-home Build to Rent and affordable housing development in Belfast.

City centre hotel, London
Hotel412 podsSteel framed

City centre hotel, London

Programme acceleration of 14 weeks vs traditional site fit-out.

Student scheme, Manchester
PBSA684 podsGRP

Student scheme, Manchester

Single-source manufacturing reduced trade interfaces on site.

Residential tower, Birmingham
BTR298 podsSteel framed

Residential tower, Birmingham

Architect-specified tiled finish delivered without site rework.

Co-living, London
PRS520 podsGRP

Co-living, London

Zero-joint construction targeted long-term operator maintenance costs.

NHS estate, regional
Healthcare180 podsGRP

NHS estate, regional

Hygienic seamless surfaces specified for clinical wash environments.

US Military forward base, Helmand Province
Military360 podsGRP

US Military forward base, Helmand Province

Deployed into a live operational theatre with zero on-site trade dependency.

HMP Rochester rebuild
Prisons240 podsSteel framed

HMP Rochester rebuild

Anti-ligature, high-security specification delivered with full HMPPS compliance.

Co-living scheme, Central London
Co-living430 podsGRP

Co-living scheme, Central London

Long-life seamless shells specified by an operator managing multiple London sites.

Boutique hotel, Edinburgh
Hotel146 podsSteel framed

Boutique hotel, Edinburgh

Bespoke finishes built into factory specification.

PRS Dandara
PRS3,078 podsSteel framed

PRS Dandara

3,078 steel framed bathroom pods for Dandara PRS developments in Birmingham, Salford and Leeds.

PRS Locke Living
PRS151 podsSteel framed

PRS Locke Living

151 hot welded steel framed bathroom pods for the 23-storey Locke Living building on Leman Street, London.

Unite PLC
PBSAVolume supplyGRP

Unite PLC

A bespoke one-piece Marine Grade Composite bathroom pod developed for Unite PLC student accommodation.

HM Prison Service
PrisonsVolume supplyGRP

HM Prison Service

A one-piece composite custodial bathroom pod with 12-hour breakout protection developed for HM Prison Service.

Premier Inn
Hotel1,500 podsSteel framed

Premier Inn

1,500 hot welded steel framed bathroom pods with tanked wall systems for three Premier Inn airport hotels in London.

Travelodge
Hotel4,000 pods per yearGRP

Travelodge

A one-piece Marine Grade Composite hotel bathroom pod for Travelodge, supplied at 4,000 pods per year from 2009.

Sectors served

From clinical environments
to flagship hotels.

Walker Modular's pods are specified across the most demanding UK construction sectors. The brief changes; the manufacturing standard does not.

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.