Co-living scheme, Central London
430 GRP pods for a central London co-living operator — one of many schemes delivered across the capital and other major UK cities for long-term operator clients.

Location
Central London
Client
Co-living operator (multi-site client)
System
GRP
Duration
20 months
Project outcomes
430
Pods delivered
Multi-site
Operator programme
0
Wall-panel joints
Co-living operators run pods hard — high turnover, intensive cleaning and long asset lives. The seamless GRP shell removes the wall-panel joints and silicone lines that typically fail first, giving the operator a genuinely low-maintenance bathroom.
This scheme is one of several Walker Modular has delivered to co-living clients across London and other major UK cities. A locked operator specification means every new site starts from a known, proven pod — with the same finish, the same layout and the same tested performance.
Challenges
What the project needed to solve.
- 01
Operator-standard specification repeated across a multi-site pipeline.
- 02
High occupant turnover requiring durable, easy-clean surfaces.
- 03
Constrained inner-London logistics with tight crane windows.
Benefit
Long-life seamless shells specified by an operator managing multiple London sites.