Manufacturing

One factory.
Six controlled stages.

Walker Modular controls the full pod manufacturing process — from BIM model to site delivery — within a single UK facility.

20+ years manufacturing200,000+ pods delivered
Walker Modular factory floor

The process

Pods, manufactured
the way they should be.

STAGE 01

Design

BIM-led pod design tailored to project drawings, MEP routes and lifting strategy.

STAGE 02

Production

Mould tooling, GRP lay-up or steel fabrication — all under one roof.

STAGE 03

Assembly

Fit-out of sanitaryware, brassware, electrical, ventilation and finishes.

STAGE 04

Testing

Hot/cold water, soil drainage, electrical and ventilation all commissioned.

STAGE 05

QA

Digital sign-off on every component, with photographic record.

STAGE 06

Logistics

Sequenced delivery to site, just-in-time for the construction programme.

QA inspection in factory

Capability

Scaled for major projects.

Two product lines

Parallel GRP and steel framed manufacturing capacity.

Programme aligned

Output sequenced to main contractor handover dates.

BIM ready

Pod families modelled and shared with the project team.

UK supply chain

Resilient, traceable, locally accountable.

Pod craned to site

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.