Premier Inn

1,500 bespoke hot welded steel framed bathroom pods with a tanked wall system, supplied for three Premier Inn hotels across London's main airports at a rate of 50 pods per week.

Hotel bathroom pod supplied by Walker Modular to Premier Inn

Location

London airports

Client

Premier Inn (via main contractor)

System

Steel framed

Duration

Supply from 2011

Project outcomes

1,500

Bathroom pods

50/wk

Production rate

3

Airport hotels

Premier Inn had been using a traditional lightweight steel frame bathroom pod system relying on plasterboard and traditional tiling. With three prestigious hotels committed across London's main airports, the hotelier's existing supply route could no longer guarantee continuity and could not offer a hot welded steel solution.

The contractor approached Walker Modular in 2010 to investigate the hot welded bathroom pod solution and its speed of delivery. Central to the contract was a bespoke welded steel framed bathroom pod with a tanked wall system around the bathing area.

A team of four specialists covered product design, technical development, project and service management. The bathroom walls were tanked in a waterproof membrane, with tiles adhered using a swimming pool flexible grout and tile adhesive so they would not delaminate during transport and installation.

The frames were manufactured and Walker Modular began supplying bathroom pods in 2011 at a rate of 50 per week, delivering all 1,500 pods on time and in full.

Challenges

What the project needed to solve.

  • 01

    The existing lightweight pod supplier had run into financial difficulties and could not guarantee continuity of supply.

  • 02

    That supplier could not provide a hot welded steel bathroom pod solution.

  • 03

    Three prestigious hotels were committed across London's main airports, requiring mass volume manufacture at pace.

Historic significance

Hotel programme experience at volume.

Delivering 1,500 pods at 50 per week for three simultaneous airport hotels established Walker Modular as a continuity-of-supply partner for national hotel operators — experience the company continues to draw on across its hotel work.

Project scale

Project

Three Premier Inn airport hotels

Location

London

Client

Premier Inn

Sector

Hotel

Pod quantity

1,500

Pod system

Hot welded steel framed, tanked wall system

Supply commenced

2011

Production rate

50 pods per week

Benefit

1,500 hot welded steel framed pods delivered on time and in full.