Loft Lines, Titanic Quarter
742 fully tiled steel framed bathroom pods manufactured in East Yorkshire and delivered to one of Northern Ireland's landmark Build to Rent developments.

Location
Belfast, Northern Ireland
Client
Watkin Jones / Lacuna Developments
System
Steel framed
Duration
Delivered on time and in full
Project outcomes
742
Bathroom pods
778
Homes
100%
On time, in full
Loft Lines at Titanic Quarter is one of Northern Ireland's landmark Build to Rent developments, delivered by main contractor GRAHAM for Watkin Jones and Lacuna Developments. The scheme provides 778 homes in total — 627 Build to Rent apartments and 151 affordable homes — within Belfast's Titanic Quarter.
Walker Modular manufactured and delivered 742 fully tiled steel framed bathroom pods for the development, produced at the company's main East Yorkshire factory and transported to Belfast as completed units.
Challenges
What the project needed to solve.
- 01
A large residential scheme of 778 homes requiring consistent, repeatable bathroom quality across 742 units.
- 02
Controlled waterproofing and finish quality at volume, rather than bathroom-by-bathroom variation built up onsite.
- 03
Coordinated manufacture and reliable delivery from an East Yorkshire factory to a Belfast site, sequenced against the main contractor's programme.
The brief
Consistency, at volume, without programme risk.
A residential scheme of this size repeats the same bathroom hundreds of times. The requirement was consistency and repeatability across every unit, controlled quality, coordinated manufacture ahead of installation and reliable delivery into a live Belfast site.
The Walker Modular solution
Traditional look. Manufactured precision.
Walker Modular supplied 742 fully tiled steel framed bathroom pods. Each pod is built on a cold-rolled steel frame and finished in the factory, so the bathroom that arrives on site looks and feels like a traditionally built room — but is manufactured to a repeatable standard.
Manufacture while you build. Deliver when you need it.
- Steel framed pod construction
- Cold-rolled steel produced on Walker Modular's automated rolling mills
- Manufacture at the main East Yorkshire factory
- Factory-controlled tanking
- Complete bathroom fit-out, fully tiled
- Repeatable factory QA
- Digital Golden Thread record for every pod
Design and BIM
Resolved before anything is manufactured.
Bathroom layouts, structural interfaces and mechanical and electrical service connections were coordinated in BIM ahead of production. Interfaces were agreed with the design team before the first frame was rolled, so the pods arrived on site as buildable, resolved units.
Steel frame manufacturing
The structure is made in-house.
Walker Modular manufactures the cold-rolled steel framing for its steel framed pods on its own automated rolling mills. Producing the frame in-house means the structural platform for all 742 pods came from the same controlled process, to the same tolerances, at the volume the programme required.
Waterproofing
Tanked in the factory, then finished.
Each bathroom was fully tanked within the controlled factory environment before the tiled finishes were completed. Waterproofing is treated as part of the manufacturing process rather than an uncontrolled site activity.
Digital Golden Thread
Every pod has a record.
Each pod carries individual traceability: its production history, stage inspections and photographic quality assurance records, retained digitally and available to the building owner across the life of the asset.
- Individual pod identification and traceability
- Production history for every unit
- Photographic QA records
- Records retained for long-term asset management
Logistics
East Yorkshire to Belfast.
Finished bathroom pods were protected and transported from the East Yorkshire factory to Belfast as completed manufactured units, sequenced against the site programme.
On time and in full
The complete 742-pod programme, delivered.
The full programme of 742 bathroom pods was delivered on time and in full.
Why bathroom pods for Build to Rent
For Build to Rent, consistency is not only a construction benefit. It becomes an operational asset.
Build to Rent schemes repeat a small number of apartment types many hundreds of times, and the owner keeps the building. That changes what matters: not just how quickly the bathroom is built, but how consistently it performs and how simply it can be maintained across decades of tenancies.
Manufacture while you build. Deliver when you need it.
- Repeated apartment types suited to manufactured repetition
- Consistent bathroom finishes across every home
- High volumes handled under factory conditions
- Programme certainty for the main contractor
- Factory QA and controlled waterproofing
- Reduced onsite trade interfaces
- Digital traceability for long-term asset ownership
- Repeatable maintenance across an identical stock of bathrooms
- Manufacture running in parallel with site construction

Cold-rolled steel framing, produced in-house on Walker Modular's automated rolling mills.
Project scale
Bathroom pods
742 steel framed
Homes
778
Build to Rent apartments
627
Affordable homes
151
Location
Belfast, Northern Ireland
Main contractor
GRAHAM
Developers
Watkin Jones / Lacuna Developments
Manufactured
East Yorkshire
Delivery
On time and in full
Benefit
Planning a Build to Rent development?
Talk to Walker Modular about bathroom pod solutions for large-scale residential projects.