Case studies/Healthcare

NHS estate, regional

180 GRP pods for an NHS estate refurbishment, delivering hygienic, seamless wash environments with full traceability and compliance documentation.

Healthcare-grade GRP pod

Location

Regional UK

Client

NHS trust

System

GRP

Duration

12 months

Project outcomes

180

Pods delivered

100%

QA traceability

Live

Phased handover

The clinical wash environment brief demanded surfaces that could be cleaned thoroughly without grout lines or panel joints. The GRP shell's seamless construction answered this directly, with a durable gelcoat finish.

Every pod was photographed, tested and QR-coded, giving the trust a complete digital record. The phased delivery allowed individual buildings to stay operational while the refurbishment was completed.

Challenges

What the project needed to solve.

  • 01

    Clinical hygiene requirements with no grout joints or silicone seams.

  • 02

    Live estate with phased handover across multiple buildings.

  • 03

    Full compliance and traceability documentation required.

Benefit

Hygienic seamless surfaces specified for clinical wash environments.

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.