HMP Rochester rebuild

240 steel framed bathroom pods for the HMP Rochester rebuild, engineered to a secure custodial specification with anti-ligature fittings and tamper-resistant service access.

Steel framed custodial bathroom pod

Location

Rochester, Kent

Client

Ministry of Justice principal contractor

System

Steel framed

Duration

15 months

Project outcomes

240

Pods delivered

100%

Anti-ligature spec

0

Compliance rejections

Custodial bathrooms carry a specification unlike any other sector — every fitting, fixing and edge is assessed for anti-ligature risk, and every service access point has to satisfy security review. Steel framed construction gave the rigidity and tamper resistance the brief demanded.

Walker Modular worked closely with the principal contractor and HMPPS to sign off finishes, fixings and service access early, then produced under a locked specification. Delivery was phased to match the sequenced rebuild of the estate.

Challenges

What the project needed to solve.

  • 01

    Anti-ligature fittings and tamper-resistant fixings throughout.

  • 02

    Secure IPS panels with controlled service access for maintenance.

  • 03

    HMPPS security and compliance sign-off on every unit.

Benefit

Anti-ligature, high-security specification delivered with full HMPPS compliance.