Boutique hotel, Edinburgh
146 steel framed pods for a boutique hotel in Edinburgh, translating a distinctive interior design into a repeatable, factory-built specification.

Location
Edinburgh, UK
Client
Boutique hotel group
System
Steel framed
Duration
14 months
Project outcomes
146
Pods delivered
8
Bespoke finishes
1
Protected delivery
The boutique brief required the pods to feel individually crafted, not modular. Steel framed construction allowed each room type to carry a different tile, sanitaryware and lighting specification, all built under factory conditions.
Factory finishing protected the high-end materials from site damage, while the steel frame's rigidity ensured the delicate tiled surfaces arrived intact. The result was a design-led hotel delivered on a manufacturing timeline.
Challenges
What the project needed to solve.
- 01
Bespoke finishes, fittings and tile layouts for a design-led brand.
- 02
Listed building constraints limiting site working hours.
- 03
Need to protect finishes during transport and installation.