City centre hotel, London

A flagship 412-key hotel in central London delivered through a steel framed pod programme, reducing site trades and accelerating the fit-out programme.

Steel framed hotel bathroom pod installed on site

Location

London, UK

Client

Tier-1 main contractor

System

Steel framed

Duration

18 months

Project outcomes

412

Pods delivered

14

Weeks saved

0

Re-worked bathrooms

The hotel brief called for a high-end tiled bathroom with varied layouts across standard, accessible and suite rooms. Each pod was engineered on a heavy-gauge steel frame, with walls finished to the architect's exact specification in the factory.

By moving the majority of bathroom trades off site, the programme avoided the congestion and sequencing conflicts that typically slow hotel fit-outs. Pods arrived fully tested, with MEP connections prepared for rapid hook-up.

Challenges

What the project needed to solve.

  • 01

    Restricted city centre site with limited crane windows and storage.

  • 02

    Architect-specified tiled finishes requiring consistent grout lines and layout.

  • 03

    Tight programme tied to hotel opening date.

Benefit

Programme acceleration of 14 weeks vs traditional site fit-out.