Student scheme, Manchester
684 GRP pods delivered to a purpose-built student accommodation scheme, replacing multi-trade bathroom construction with a single manufacturing partner.

Location
Manchester, UK
Client
Student accommodation developer
System
GRP
Duration
22 months
Project outcomes
684
Pods delivered
1
Manufacturer
24h
Hook-up target
The GRP system's seamless shell was the right fit for a high-volume, hard-wearing environment. Each pod was moulded, fitted, tested and QR-coded before leaving the factory, giving full traceability across the 684-unit scheme.
Single-source manufacturing meant one point of accountability for quality, one delivery schedule and one handover standard. The result was fewer site trades, reduced snagging and a faster route to practical completion.
Challenges
What the project needed to solve.
- 01
High volume with repetitive layouts but tight unit tolerances.
- 02
Need to reduce site labour and water-leak risk across 684 units.
- 03
Logistics coordination across a multi-phase build.