Case studies/PRS/From the Walker Modular archive

PRS Locke Living

151 hot welded steel framed bathroom pods for the 23-storey Locke Living development on Leman Street, London, with bespoke design, sourced sanitaryware and bespoke furniture.

Bathroom pod interior supplied to the Locke Living development on Leman Street, London

Location

Leman Street, London

Client

Locke Living

System

Steel framed

Duration

Supply from 2015

Project outcomes

151

Bathroom pods

30/wk

Production rate

23

Storeys

The 23-storey apartment block on Leman Street set out to make Locke a design-led building for people who wanted to challenge the status quo. It was initially thought that the only route to those high-end ideas was traditional onsite labour.

Leman Street instead requested a high-end bathroom pod design to complement its approach. Walker Modular's hot welded steel framed bathroom pod solution fitted the development, with bespoke design, sanitaryware sourced from around the world and bespoke furniture.

A team of four specialists was assigned to the project, covering product design, technical development, project and service management. The frames were manufactured and Walker Modular began supplying bathroom pods in 2015 at a rate of 30 per week, delivering all 151 pods on time and in full.

Challenges

What the project needed to solve.

  • 01

    A 23-storey apartment block that needed individuality and a design-led identity.

  • 02

    An initial assumption that the high-end brief could only be achieved with traditional onsite labour.

  • 03

    Bespoke sanitaryware and furniture sourced from around the world.

Historic significance

Proof that design-led schemes suit bathroom pods.

Locke Living demonstrated that a highly individual, design-led scheme could be delivered with factory-built bathrooms rather than traditional onsite construction — a reference point Walker Modular still draws on for premium residential enquiries.

Project scale

Project

Locke Living, Leman Street

Location

London

Client

Locke Living

Sector

Private rented sector

Pod quantity

151

Pod system

Hot welded steel framed

Supply commenced

2015

Building height

23 storeys

Benefit

A design-led aparthotel served by hot welded steel framed pods.