Co-living, London

520 GRP pods for a co-living operator, chosen for the long-term durability and low maintenance profile of a seamless composite shell.

Seamless GRP pod interior

Location

London, UK

Client

Co-living operator

System

GRP

Duration

24 months

Project outcomes

520

Pods delivered

0

Wall joints

30%

Reduced site waste

For a long-life operator, the GRP system's lack of wall joints and silicone-dependent seals was a decisive factor. The one-piece shell removes the most common leak path and reduces the ongoing maintenance burden.

Factory construction also cut site waste dramatically. Offcuts were captured for recycling, and the consolidated delivery schedule reduced lorry movements to the tight London site.

Challenges

What the project needed to solve.

  • 01

    Operator required low lifetime maintenance and high durability.

  • 02

    Repetitive layout with consistent finishes across 520 units.

  • 03

    Sustainability and waste reduction targets on site.

Benefit

Zero-joint construction targeted long-term operator maintenance costs.

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.