PRS Dandara
3,078 cold rolled steel framed bathroom pods supplied to Dandara's private rented sector developments at Arena Central Birmingham, Chapel Wharf Salford and Sweet Street Leeds, from 2017.

Location
Birmingham, Salford and Leeds
Client
Dandara
System
Steel framed
Duration
Supply from July 2017
Project outcomes
3,078
Bathroom pods
30/wk
Production rate
3
Developments
Dandara creates award-winning new homes to buy and rent throughout the UK, and its private rented sector programme is an example of the growth in the PRS market. Dandara requested an elegant bathroom pod design to complement its high-end approach, and Walker Modular's steel bathroom pod solution fitted the developments with bespoke designs and luxurious finishes.
A team of specialists was assigned to the project, with skills across product design, technical development and project management. The first task was to create a cold rolled steel bathroom pod that could be manufactured in volume to facilitate the rapid speed of build envisaged by the contractor.
The frames were manufactured and Walker Modular began supplying bathroom pods in July 2017 at a rate of approximately 30 per week, delivering all 3,078 pods on time and in full for Arena Central Birmingham, Chapel Wharf Salford and Sweet Street Leeds.
Challenges
What the project needed to solve.
- 01
An elegant bathroom pod design was required to complement Dandara's high-end approach to PRS housing.
- 02
Volume manufacture had to match the rapid speed of build envisaged by the contractor.
- 03
Bespoke designs and luxurious finishes across three separate developments.
Historic significance
One of Walker Modular's largest PRS programmes.
At 3,078 bathroom pods across three city centre developments, the Dandara programme remains one of the largest private rented sector deliveries in Walker Modular's track record, and an early demonstration of sustained volume supply to a single residential client.
Project scale
Project
Dandara PRS developments
Location
Birmingham, Salford, Leeds
Client
Dandara
Sector
Private rented sector
Pod quantity
3,078
Pod system
Cold rolled steel framed
Supply commenced
July 2017
Production rate
Approx. 30 pods per week
Benefit
3,078 bathroom pods delivered on time and in full across three PRS developments.