Latest News

Project Awarded:

Zurich House, Portsmouth

Posted: Jan 29, 2016

The Knightsbridge development will see the refurbishment of the derelict Zurich House in the heart of Plymouth transformed into a 1000 bed student residence arranged over 12 storeys. The accommodation will be a mixture of clusters and studios each with ensuites provided by Walker Modular. The1

Learn more >

Project Awarded:

Travelodge Hartlepool Marina

Posted: Dec 03, 2015

Walker Modular are pleased to be providing the bathroom pods for the new 65 bedroom Travelodge Hotel at Hartlepool Marina. The new multimillion pound scheme is been built in the popular location of The Lanyard.

Learn more >

Project Awarded:

Beckley Court, Cobourg Street, Knightsbridge

Posted: Dec 02, 2015

The £29.5m student accommodation project will provide 507 beds across a mix of cluster flats, studios and two bedroom flats. The 22 storey development is set to become Plymouths tallest building.

Learn more >

Project Awarded:

Laycock Building, Sheffield

Posted: Dec 01, 2015

The new student accommodation for Sheffield Hallam University will see the redevelopment of a derelict industrial site into 142 student flats. The development, on the doorstep of Sheffield Hallam University’s central campus, is for five storeys of self-contained studio flats fronting Suffolk Road1

Learn more >

Project Awarded:

Brougham Hayes, Bath

Posted: Nov 05, 2015

The new Brougham Hayes student accommodation will see the complete renovation of the former Bath depot which lies at the junction of Lower Bristol Street, 1.2 km from Bath’s city centre. The development will consist of 104 student studios each with bathroom pods provided by Walker Modular, the1

Learn more >

Project Awarded:

Spring Place, Luton

Posted: Nov 04, 2015

This new student accommodation at Spring Place, Luton, will include luxury ensuite rooms and studio suites with all 206 bathroom pods provided by Walker Modular. The accommodation will also feature a state-of-the-art gym, cinema room and other modern amenities London Spring Place is located1

Learn more >

Project Awarded:

Morfa Road, Phase 2

Posted: Nov 03, 2015

Phase 2 of the Morfa Road development will see the construction of a 330 bedroom student accommodation all with ensuite bathrooms. A new external layout was also included as part of this project, comprising of an additional vehicular access via residential estate road together with a 5 space1

Learn more >

Project Awarded:

Hanover Street, Glasgow

Posted: Nov 02, 2015

The new 13 storey Student Accommodation and Hanover Street, Glasgow, will house 441 students and include 420 Walker Modular Bathroom Pods. The V-shaped brick clad block will act as a gateway into the city with a tall, slender element on the corner of Dobbie’s Loan stepping down to lower rise nine1

Learn more >

Project Awarded:

Travelodge, Chapel Street, Peterhead, Aberdeenshire

Posted: Oct 02, 2015

The new Travelodge development on Chapel Street in Peterhead, Aberdeenshire comprises of 120 bedrooms, Walker Modular are proud to be the bathroom suppliers for this new project. The site will create 16 new jobs and could bring an estimated £20million per year to the local economy. 

Learn more >

Index 03

Newsletter

Sign up to our newsletter
keep up to date with
our latest news.

Read more
Index 05

Contact us

If you are interested in working
with Walker, we would love to
hear from you.

Read more
Index 07

Need a quote?

We have a committed team
driven to deliver the most
competitive prices to you

Read more
Index 09

Facts and Figures

Forward thinking
manufacturing taking
the country by storm.

Read more

About Walker Modular

Walker Modular is the leading manufacturer of Bathroom Pods in Great Britain and the only choice for superior quality bathroom pods. We are the primary supplier of bathroom pods to many of the UK’s leading developers and blue chip companies. From five star hotels and hospitals to prisons, nursing homes and student accommodation, we’ve designed and built bathroom pods for every environment.

We have unrivalled knowledge, experience and state-of-the-art production facilities to ensure our bathroom pods remain the number one choice. We have a committed team driven to deliver the highest possible standards and care for our clients and their bathroom pods, even after delivery.

If you have a requirement for bathroom pods no matter how large or small; then we have a solution tailored for your needs. We have our own delivery fleet and pod transportation process to ensure every unit arrives on site intact and on time. Visit us to discover why we are so much more than a bathroom in a box.