News/Project awarded/February 2024

Walker Modular bathroom pods for The Store House, 140–142 Briggate, Leeds

Walker Modular is supplying bathroom pods for The Store House at 140–142 Briggate — a city-centre redevelopment on one of Leeds' principal retail streets, combining ground-floor commercial space with new residential accommodation above.

Architectural rendering of The Store House at 140–142 Briggate, Leeds, showing the arched stone façade with retail units at street level

Location

Briggate, Leeds

System

Steel framed

Location

Leeds

Scope

Bathroom pods

The story

Walker Modular's role on Walker Modular bathroom pods for The Store House, 140–142 Briggate, Leeds.

The Store House at 140–142 Briggate is a city-centre redevelopment on one of Leeds' principal retail streets, bringing forward commercial space at ground level with new residential accommodation on the floors above.

Walker Modular is supplying factory-manufactured bathroom pods for the scheme. Each bathroom is built, fitted out and quality checked within Walker Modular's controlled factory environment before it is delivered to site as a complete unit.

Briggate is a pedestrianised, heavily trafficked city-centre street with restricted vehicle access and no meaningful storage space on site. Manufacturing the bathrooms off site removes a long sequence of wet trades from that environment and reduces the number of deliveries and trade movements the site has to absorb.

Deliveries are sequenced against the construction programme and managed by Walker Modular's own fleet and drivers, who are experienced in delivering into constrained city-centre sites.

Every pod carries its own digital quality record, giving the project individual traceability and photographic quality assurance records that remain available for the life of the asset.

Next project

Start your next project
with Walker Modular.

Prefer to talk? Call us on 01482 703302.